10710 Chapel Hill Road, Morrisville, NC, United States
Project consisted of up to 48" large diameter gravity sewer lines, new man holes, and FOUR Eno River crossings by open cut. The river flow was managed utilizing the "Aqua Dam" product, drastically reducing erosion, environmental damage, and time. The goal was to install the sewer line while protecting the river, and keep the river clean and free of contaminates at all times.